Qingdao Huashida Machinery Co., Ltd.

Pipeline Anticorrosion Thermal insulation Pipe production lineMACHINERY MANUFACTURER

Manufacturer from China
Verified Supplier
2 Years
Home / Products / 3LPE Coating Pipe Production Line /

3lpe Steel Pipe Anti Corrosion FBE Coating Production Machinery

Contact Now
Qingdao Huashida Machinery Co., Ltd.
Visit Website
City:qingdao
Province/State:shandong
Country/Region:china
Contact Person:MrLily
Contact Now

3lpe Steel Pipe Anti Corrosion FBE Coating Production Machinery

Ask Latest Price
Brand Name :Huashida
Certification :ISO9001
Place of Origin :Qingdao,Shandong,China
MOQ :1
Payment Terms :L/C, D/A, D/P, T/T, Western Union, MoneyGram
Delivery Time :7 work days
Packaging Details :according to customer's requirement
Coating Thickness :1.8-3.7mm
Control System :PLC Control
Pipe Length :6-12m
Coating Type :3LPE (Three Layer Polyethylene)
Pipe Diameter Range :Φ219-Φ1420mm
Total Power :800kW
Operating Mode :Automatic/Manual
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

3lpe Steel Pipe Anti-Corrosion Fbe Coating Production Machinery,High capacity

Product Description

3LPE /FBE pipe blasting/ coating/ PE film extrusion assembly production line
production range processing capacity Cleaning class

used material

159mm-1600mm 159mm-1600mm Sa2.5 FBE powder, binder, polyethylene

Description:
Qingdao Huashida Machinery Co., LTD. Steel elbow 3PE anticorrosive production line, mainly used in the manufacture and processing of oil and gas transportation, water supply transportation, sewage transportation, chemical transportation for 3PE anticorrosive bend (arc pipeline).
At least 16 groups of bending pipe conveying structure are arranged, the bending pipe is placed on the bending pipe conveying structure, the rotating shaft of the driving mechanism is driven by the rotating motor, and the rotating power is driven by the driving mechanism as the center. The center height of different pipe diameters is unified by the lifting device of the bending pipe conveying structure to adjust the height of the hanging roller.
3lpe Steel Pipe Anti Corrosion FBE Coating Production Machinery

Steel pipe conveyor system

How does 3PE pipe bending anticorrosive production line remove rust from the outside of the steel pipe? The steel pipe body comes online from the upper pipe platform, the outer wall of the steel pipe is removed by shot blasting and rust removal machine, the finished steel pipe enters the inner shot blasting machine, and the finished internal rust removal steel pipe enters the inner ring production line for epoxy powder coating on the outer surface, when the pipe bends through the ring powder chamber, Spray powder outside the pipe by powder spray gun, and effectively shield the powder floating around, and recycle the powder through the recovery device.


Application:
3LPE /FBE pipe blasting/ coating/ PE film extrusion assembly production line. The three-layer PE process, with the epoxy powder coating as bottom layer, binding and bundling through polyethylene PE and adhesive, is widely used in anticorrosion of steel pipes at home and abroad, and applied to the oil pipeline and gas pipeline, as well as to the gas supply and water supply for civil use.

3lpe Steel Pipe Anti Corrosion FBE Coating Production Machinery

Technological processes:
Upload pipes→pipes screw conveyor→rust removal of intermediate frequency heating→Epoxy powder coating→outer layer soli quid & polyethylene coating→cooling spray→pipes screw conveyor→grinding pipes, send→unload pipes
3lpe Steel Pipe Anti Corrosion FBE Coating Production Machinery



Qingdao Huashida 3pe anti-corrosion equipment R & D team
Wu Daming, technical consultant of Huastar, is the deputy director of the College of Mechanical and Electrical Engineering of Beijing University of Chemical Technology, the deputy director of the Beijing Key Laboratory for the Preparation and Processing of New polymer Materials, and the expert committee of the China Plastics Processing Association. He has published 2 monographs, more than 150 scientific and technological papers, 16 patents, and more than 20 SCI and EI papers.
The technical consultant of Huashta is Wu Weiping, a bachelor of Chemical machinery from Beijing University of Chemical Technology, a master of engineering from the School of Mechanical Engineering of RWTH Aachen University in Germany, chairman of Shandong Alpur Energy Saving Equipment Co., LTD., a representative of the ninth National People's Congress, and currently a member of the Standing Committee of the Shandong CPPCC. The main research areas are plastic machinery, polymer materials, air source heat pump.
Zhou Kaitian, technical director of Huashida, graduated from Mudanjiang University majoring in mechatronic integration. He once worked in Hebei Zhongyuan Pipeline Group Co., LTD., Qingdao Okang Anticorrosion Co., LTD., responsible for the design of oversized pipe diameter anticorrosion production line and steel pipe inner and outer surface rust removal, surface spraying and 3PE anticorrosion non-standard equipment.
3lpe Steel Pipe Anti Corrosion FBE Coating Production Machinery


3lpe Steel Pipe Anti Corrosion FBE Coating Production Machinery
advantage

1, 3pe anticorrosive steel pipe has very high sealing, long-term operation can greatly save energy, reduce costs, protect the environment.
2, the construction is simple and fast, and the service life can reach 30-50 years.
3, also has good impact resistance under low temperature conditions, PE water absorption is low.
4, at the same time with high epoxy strength, PE low water absorption and hot melt adhesive softness, has a high anti-corrosion reliability, this anti-corrosion is characterized by simple production process, good anti-corrosion effect, low price, is the pipeline manufacturing industry generally recognized anti-corrosion method 2, oil and gas with three layers of polyethylene (3PE) steel pipe anti-corrosion, two layers of polyethylene (2PE) steel pipe anti-corrosion.

3lpe Steel Pipe Anti Corrosion FBE Coating Production Machinery

Inquiry Cart 0